SpotWire

Get ahead of the scarcity trade in physical AI.

Four published index records cover compute, interconnect, power, and facility. Credit and debt financing is the fifth research lane, with SWDI in development. Collection continues frequently; editorial deep dives publish monthly. Free.

Free monthly. A new deep dive on the physical AI stack in each editorial edition. · No spam, unsubscribe anytime.

October 30 collection is under source and coverage review. These four index levels and changes remain September values; SWDI has no published level.

Last published: SpotWire · ·Snapshot snapshot-9ef50e9f757dba6ee5976ca394d614eb44022b94dcc66fb4951a50d917f406dd·Immutable JSON·Methodology

Five lanes, dated evidence.

These primary-source figures describe different parts of the buildout. They are not October SpotWire index levels.

Read the monthly briefing →

The stack,
by layer.

The last published snapshot keeps each layer’s September signal tied to the same immutable payload. Read the component primitive and source-specific observation count before drawing a market conclusion.

These are index signals, not universal transaction totals or promises about any individual item. Explore the component records.

Four published indices.
A fifth in development.

The four published records below are dated September 4; the October collection is under review. SWDI is the fifth lane and has no level yet. Each published index aggregates the components defined in its record. Collection windows, configured weights, effective weights, primitives, and counts are disclosed per index; no universal window or equal-weight claim is implied.

SWCI

Last published · Sep 4, 2026

106.5

— MoM·+24.2% YoY

7 components

gpu: n=0·server: n=0·ssd: n=0·ram: n=0·hyperscaler: n=105·hbm: n=7·frontier gpu: n=131

Legacy GPUs · Servers · Enterprise SSD · Server DDR4 RDIMM · Hyperscaler GPU rental · HBM stress · Frontier GPU OEM

DetailsAll formats

SWII

Last published · Sep 4, 2026

97.6

-4.2% MoM

Indicative6 components

networking ebay: n=0·transceiver ebay: n=0·fs new list: n=7·infiniband fs: n=0·dac aoc fs: n=10·nvswitch oem: n=1

Networking eBay · Transceiver eBay · Ethernet optics survey · InfiniBand survey · DAC/AOC survey · NVSwitch OEM

DetailsAll formats

SWPI

Last published · Sep 4, 2026

107.6

+2.0% MoM

5 components

lmp: n=1·queue depth: n=2,630·backlog growth: n=5·lead time: n=14·ppi: n=4

Nationwide LMP · Queue depth · Backlog growth · Lead-time · BLS PPI

DetailsAll formats

SWFI

Last published · Sep 4, 2026

123.1

-4.3% MoM

6 components

tm ebay: n=17·plc ebay: n=253·ppi process: n=24·ppi hvac: n=24·edgar sentiment: n=4·cooling: n=0

T&M · PLC · PPI process instruments · PPI HVAC · EDGAR cohort sentiment · CDW cooling channel

DetailsAll formats

SWDI

In development · no published level

—

A proposed monthly credit and debt financing index. Comparable funded deals and a reviewed method are required before a level can be published.

Details

Mixed sources, explicit disclosures.

4
snapshot-9ef50e9f757dba6ee5976ca394d614eb44022b94dcc66fb4951a50d917f406dd
September 4, 2026
24

One email.
Every month.
One public deep dive.

Free, forever. The collection snapshot remains public and citable; the editorial email cadence is separate from the date of any underlying observation.

  • The collection snapshot

    Current values, comparisons when supplied, and immutable snapshot links for the four published indices. SWDI is in development.

  • The public deep dive

    A focused look at a physical-AI bottleneck, geography, component, or market dynamic.

  • Methodology updates

    Changes to composition, source handling, or disclosures are dated and explained.

The physical AI buildout needs a reference language for the infrastructure beneath the headline. SpotWire makes the source and the uncertainty visible.

Read the index
and a new deep dive each month.

One email a month. Free to read, free to share. No spam, no upsell.